Our team is pleased to be providing civil engineering, project management, and contract administration services for the Yuułuʔiłʔatḥ Sewage Lift Station Upgrades project. The project involves the relocation and upgrade of an existing sanitary lift station to improve system reliability, accommodate future growth, and address geotechnical constraints at the current site. Our scope of work includes:
Assessment of existing infrastructure and system capacity
Preparation of design drawings, technical design briefs, and cost estimates through multiple design stages
Tender support services including preparation of contract documents
The Kel,Set (Reay) Creek Pond Remediation Project remediated contaminated soils that have been impacted by former industrial processes within the upgradient Transport Canada Site. Work under this contract included:
Design and construction of a creek bypass system to allow excavation within a dry creek bed.
Excavation, transport and disposal of contaminated creek sediments.
Restoration of creek bedding and reinstatement of the creek.
A Water Management Plan (WMP) was developed to provide an overall comprehensive strategy for the management of water during the draining of the creek, diversion of water around the excavation, management of seepage water within the work area, and reinstatement of the creek.